Bridgton Hospital
Building Envelope Specialists, Inc. offered critical post-construction envelope consulting services as part of a moisture infiltration investigation. Tasked with a conditions assessment, thermal imaging, and moisture monitoring, BES uncovered a condensation problem that resulted from inappropriate building design and substandard construction oversite. BES developed repair documents that detailed a repair of the interior face of the exterior wall assembly. Repair scope included moisture barrier replacement and modifications to the insulation system.